Sunday, April 20, 2014

SURVEYING & CHAIN SURVEY / TAPE SURVEY ---- BY. MWL. JAPHET MASATU

Watershed Management Including Surveying

 INTRODUCTION:
1. Introduction to Surveying
2. Object, Use & Principles of Surveying
3. Difference between Plane and Geodetic Surveying
4. Instruments used in Surveying
5. Instruments for Setting out Right Angles
6. Method of Measuring Distance
7. Ranging out Survey Line
8. Chain Survey
9. Cross Staff Survey
10. Plane Table Surveying
11. Methods of Plane Tabling
12. Computation of Area
13. Introduction to Levelling
14. Dumpy Level
15. Classification and Principle of Leveling
16. Study of Contour
17. Introduction to Runoff
18. Factors Affecting runoff
19. Direct Runoff and Time of Concentration
20. Runoff Coefficient
21. Runoff Measuring Devices
22. General Requirement for the Setting and Operation of Weirs
23. Parshall Flumes
24. Orifices
25. Principles of Soil and Water Conservation
26. Types of Soil & Water Erosion
27. Factors Affecting Soil & Water Erosion
28. Measures for Soil and Water Conservations
29. Terracing
30. Contour and Graded Bunding
31. Types of Pumps
32. Centrifugal Pumps, Vertical Turbine Pumps and Submersible Pumps
33. Concepts of Watershed Management
34. Classification of Watershed
35. Watershed Management
 

No comments:

Post a Comment